Location: | Sevenoaks, Kent |
---|---|
Client: | Sevenoaks Hockey Club |
Operations Director: | Smith Construction (Heckington) Ltd |
Surface System: | Lano Excelsior |
Contract Value: | £280,000 |
Works Began: | October 2005 |
Handover of all site works: | February 2006 |
Project: A FIH National Standard Sand Dressed Hockey Pitch
Turnkey Design and Build contract to completely rebuild and extend the existing sand dressed hockey pitch, to meet the requirements of FIH National Standard. The facility includes a sustainable drainage system, new spectator viewing areas and coaches shelters. The pitch ball stop fencing was designed to secure the site.